PRINT TRAY

Your exact files

Your selected public edition identities stay in this browser until you remove them. Changed files are never silently replaced.

Build this packet

Projects & practical work

Craft project planner

A flexible record for making, changing, and finishing.

US Letter · 2 PDF pages · Print PDF

Go to download

All 2 pages available to preview

Page 1 of 2

Preview of the actual PDF. Open complete PDF

READY TO PRINT

Download this printable.

Paper
US Letter
Pages
2
File
Print PDF
Download PDF
Other designs or file types
Complete file list

Free · 7 KB · No account needed

For covered files: personal, classroom, noncommercial community and your own internal business records. Resale or a product incorporating a design needs separate permission. Read full use permissions.

See what is on each page
  • Page 1 — Printable page 1
  • Page 2 — Printable page 2

Enter these page numbers in your PDF viewer’s print range. Keep any instructions, matching answers and required project pieces.

Save or prepare these pages

Something wrong with the print?

Check the specific problem, then return to this selected PDF.

Back to the selected file · Report a problem with this printable

Craft project planner / US Letter

A good fit for your idea?

Choose the PDF matching your paper size. Preview each page before printing.

Printing, file details and help

About this file

A flexible record for making, changing, and finishing.

2 printable pages in the US Letter edition.

From file to finished page

  1. Open the US Letter PDF if that is the paper loaded in your printer.
  2. Print at 100% or Actual Size so the layout and writing spaces retain their intended proportions.
  3. Use the prompts and blank space on the sheet for your own notes or activity.
Printing and use notes

Inspect the actual preview and paper size before printing.

Direct PDF files by design
Craft project planner (2 files)
  • US Letter — print PDF · 2 pages
    Page numbers and contents
    • Page 1 — Printable page 1
    • Page 2 — Printable page 2
  • A4 — print PDF · 2 pages
    Page numbers and contents
    • Page 1 — Printable page 1
    • Page 2 — Printable page 2

Use permissions · Return to selected file

Craft project planner

Open complete PDF