PRINT TRAY

Your exact files

Your selected public edition identities stay in this browser until you remove them. Changed files are never silently replaced.

Build this packet

Projects & practical work

Quilting project planning kit

A packet with Quilt cutting checklist and Quilt fabric pull planner, plus 2 other resource packets.

US Letter · 5 PDF pages · Print PDF

Go to download

2 preview images · 5 PDF pages. Open the complete PDF for every page.

Page 1 of 2

Preview of the actual PDF. Open complete PDF

READY TO PRINT

Download this printable.

Paper
US Letter
Pages
5
File
Print PDF
Download PDF
Other designs or file types
Complete file list

Free · 173 KB · No account needed

For covered files: personal, classroom, noncommercial community and your own internal business records. Resale or a product incorporating a design needs separate permission. Read full use permissions.

See what is on each page
  • Page 1 — Packet contents
  • Page 2 — Quilt cutting checklist - page 1
  • Page 3 — Quilt fabric pull planner - page 1
  • Page 4 — Quilt block assembly record - page 1
  • Page 5 — Quilting supply labels - page 1

Enter these page numbers in your PDF viewer’s print range. Keep any instructions, matching answers and required project pieces.

Save or prepare these pages

Something wrong with the print?

Check the specific problem, then return to this selected PDF.

Back to the selected file · Report a problem with this printable

Quilting project planning kit / LETTER

A good fit for your idea?

Review the component list and sequence before printing. Reused components are useful parts of the pack, not extra original designs.

Printing, file details and help

About this file

4 coordinated resource packets and one contents sheet.

From file to finished page

  1. Read the contents sheet and identify which included resources are needed for your task.
  2. Use actual-size printing. Reference markers are component-specific; do not assume every sheet has the same marker.
  3. Print only the required working pages; retain instruction and answer pages with their matching resources.
  4. Use the component-specific instructions and reference markers. A kit combines existing pieces for convenience; it does not change their geometry or capabilities.
Printing and use notes

Make one trial on ordinary paper before using special stock or preparing a batch. No physical test result is claimed.

Direct PDF files by design
Quilting project planning kit (2 files)
  • US Letter — print PDF · 5 pages
    Page numbers and contents
    • Page 1 — Packet contents
    • Page 2 — Quilt cutting checklist - page 1
    • Page 3 — Quilt fabric pull planner - page 1
    • Page 4 — Quilt block assembly record - page 1
    • Page 5 — Quilting supply labels - page 1
  • A4 — print PDF · 5 pages
    Page numbers and contents
    • Page 1 — Packet contents
    • Page 2 — Quilt cutting checklist - page 1
    • Page 3 — Quilt fabric pull planner - page 1
    • Page 4 — Quilt block assembly record - page 1
    • Page 5 — Quilting supply labels - page 1

Use permissions · Return to selected file

Quilting project planning kit

Open complete PDF